This completed downloadable of Guide to JCT Standard Building Contract 2016 1st Edition Sarah Lupton

Instant downloaded Guide to JCT Standard Building Contract 2016 1st Edition Sarah Lupton pdf docx epub after payment.
Product details:
- ISBN 10: 1000701379
- ISBN 13: 9781000701371
- Author: Sarah Lupton
Guide to JCT Standard Building Contract 2016 is a practical guide to the operation and administration of JCT’s SBC 2016 suite of building contracts (SBC/Q, SBC/AQ and SBC/XQ). All of the contracts’ provisions, procedures and conditions are organised and explained by subject, clearly distinguishing the different obligations due to various parties and the contractual issues arising during the course of a job – all backed up by the latest legislation and case law.
Table of contents:
1 About SBC16
Key features
Deciding on SBC16
Changes in the 2016 edition
2 The contract documents
‘Contract Documents’
Contract drawings
Contract bills
Employer’s requirements
Contractor’s proposals
CDP analysis
BIM and other protocols
Other documents
Activity schedule
Information release schedule
Health and safety documents
Bonds
Sub-contract documents
Use of documents
Interpretation, definitions
Priority of contract documents
Inconsistencies, errors or omissions
Errors in the contract bills
The contract bills and contract drawings
Employer’s requirements and contractor’s proposals
Divergences from statutory requirements
Custody and control of documents
Assignment and third party rights
Assignment
Third party rights/warranties
Procedure with respect to third party rights and warranties
3 Obligations of the contractor
The works
Contractor’s design obligation
Extent of design liability
Level of design liability
Materials, goods and workmanship
Obligations in respect of quality of sub-contracted work
Compliance with statute
Other obligations
4 Programme
Possession by the contractor
Progress
Completion
Pre-agreed adjustment
Extensions of time
Principle
Procedure
Assessment
Partial possession
Use or occupation before practical completion
Practical completion
Procedure at practical completion
Failure to complete by the completion date
Liquidated damages
5 Control of the works
Site manager and contractor’s persons
Employer’s representative
Clerk of works
Principal contractor
Information to be provided by the contract administrator
Information provided by the contractor
Contractor’s design submissions
Schedule 1 procedure
Contract administrator’s instructions
Variations
Variations to the contractor’s designed portion
Defective work
Testing work
Non-compliance with clause 2.1
Sub-contracted work
Domestic sub-contractors
Listed sub-contractors
Named specialists
Work not forming part of the contract/persons engaged by the employer
Making good defects
6 Sums properly due
An approximate quantity
Provisional sums
Defined work
Undefined work
Valuation of variations
Schedule 2 variation quotations
Valuation by the quantity surveyor
Reimbursement of direct loss and/or expense
Fluctuations
7 Payment
Advance payment
Interim certificates – timing
Procedure for ascertaining amounts due
Coverage of the certificate
Value of work properly executed
Unfixed materials
‘Listed Items’
Costs and expenses due to suspension
Sum due
Retention
Bond in lieu of retention
Advance payments and bonds
VAT
Payment procedure
Payment when no certificate is issued
Deductions
Contractor’s position if the certificate is not paid
Contractor’s position if it disagrees with amount certified
Interim payment on practical completion
Final certificate
Payment when no final certificate is issued
Conclusive effect of final certificate
8 Insurance
Injury to persons and damage to property
Damage to property not caused by the negligence of the contractor
Insurance of the works
Action following damage to the works
Terrorism cover
Professional indemnity insurance
The Joint Fire Code
Other insurance
The contract administrator’s role in insurance
9 Termination
Repudiation or termination
Termination by the employer
Insolvency of the contractor
Consequences of termination
Termination by the contractor
Consequences of termination by the contractor
Termination by either the employer or the contractor
Termination of a named specialist’s employment
10 Dispute resolution
People also search:
what is a jct standard building contract
what is a jct building contract
jct standard form of building contract with quantities 2016
guide to jct design and build contract 2016
guide to jct contracts


